Viewing the Job Summary by Type
| Article:HOWTO71179 | | | Created: 2012-02-08 | | | Updated: 2012-02-09 | | | Article URL http://www.symantec.com/docs/HOWTO71179 |
The Job Summary by Type section shows an overall distribution of jobs by the job type based on the current View pane and time frame selection. This information is shown in a pie chart as well as a table. Data for the last 24 hours is shown by default. You can also view data for the last 48 hours or 72 hours.
See Controlling the scope of Monitor views.
A pie chart with different colors represents the job distribution by job type in this section. Each color of the pie chart represents how jobs are distributed in your environment as per the job type. You can also view the color code summary in this section to know the colors that represent different job types. Moving your cursor over the pie chart gives the number and percentage of jobs of a particular job type in your NetBackup environment. For example, pointing to the red color in the pie chart shows that in the last 24 hours, 22 jobs, or 42% jobs in your environment are DBBackup jobs.
You can drill down from this section to see details for different job types like DBBackup, Image Cleanup etc.
To view jobs by job type
Select Summary View from the drop-down list. Note that the drop-down list is located on the top-right corner of the page.
In the Job Summary by Type section, do either of the following:
Click the number of jobs (link) corresponding to a particular job type from the table. For example, click the number that is shown for DBBackup jobs.
Click a colored section of the pie chart that corresponds to a particular job type. For example, click the red section of the pie chart to view details for DBBackup jobs.
See Viewing the Job Summary by Exit Status
|
|
Legacy ID
v26791013_v71396211
Article URL http://www.symantec.com/docs/HOWTO71179
Terms of use for this information are found in Legal Notices









Thank you.