How to schedule a verification job for Deduplication.

Article:TECH88179  |  Created: 2009-01-05  |  Updated: 2013-01-04  |  Article URL http://www.symantec.com/docs/TECH88179
Article Type
Technical Solution


Issue



How to schedule a verification job for Deduplication.


Cause



  The Deduplication Backup job with  Verify option checked  takes long  time to complete.


Solution



Scheduling a verification job:



In Backup Exec 2010, a verification job can be scheduled to run at any specified time and not during the backup window. This can be done by creating a new policy with the following settings:
  1. Add a new backup job template for deduplication  job.
  2. Create a new verification template and associate it with the newly created backup template.
  3. Set a schedule for the verify template.


The slide above shows a new policy with a deduplication backup job template and a verification template.

Note: The above solution only applies to Backup Exec 2010.
 

 


Supplemental Materials

Description

 Resize the document picture  and  added the cause

 and removed  not required server from Selected categories



Legacy ID



338195


Article URL http://www.symantec.com/docs/TECH88179


Terms of use for this information are found in Legal Notices