Ghost Solution Suite 2.5 on Windows Server 2008 running Hyper V using wrong network for sending information.
HI,
I have tried to find information on this and havent so i am hoping you guys and gals can help.
I am using Ghost solutions Suite 2.5 installed on Windows Server 2008 standard edition x64,
The server is also running Hyper V for a DC server Server 2008 standard x32.
The problem i am having is with the network used to send information during a ghost cast session. I have 2 network points when shared to the VM the other for the server itself both of these are full gigabit and the virtual network connection is 10gb.
anyways when i ghost instead of using the standard port for the server it uses the linked to virtual machine one, even when i use the ip address of the direct line it still uses the virtual link. This is annoying as it limits the ghost sessions to about 187 megabytes a minute on a full gigabit network. before we upgraqded to 2008 we had 2003 and ghost run fine.
Thanlks in advance a very frustrated IT support Technician.