how to enable subjobs opscenter 7.5

Created: 21 Feb 2013 • Updated: 01 Mar 2013 | 3 comments
This issue has been solved. See solution.

Does anyone know how to enable sub jobs in the data collection as it is currently showing as "not started".

My master is 7.5.0.4 and so is my Opscenter server - Both Windows 2008

Thanks

Dan

Operating Systems:

Comments 3 CommentsJump to latest comment

Stavros41's picture

Hi Dan

Looks like no one has come across this one. Can I ask if this has been upgraded from older versions ie 7.1 or was a fresh 7.5 install thats been patched to 7.5.0.4?

I am assuming you are licensed for Analytics as I believe this was a requirement

daniel.hooper's picture

Actually both.

our internal reporting was upgraded from VBR to Opscenter and has gradually got to the latest along the way.

Our customers Opscenter is brand new and behaves the same

tom_sprouse's picture

Daniel,

The Breakup Jobs functionality applies to Symantec OpsCenter Analytics only.
The Breakup Jobs functionality cannot be used with Symantec OpsCenter (free version)
 
You need to enable breakup / subjobs collection in the scl.conf file on OpsCenter Server, for NetBackup 7.1
or later master servers (disabled by default).
 
Note:
 
--- Enabling or disabling the Breakup Jobs option using scl.conf applies to 7.1 or later master servers only.
--- Enabling the Breakup Jobs option increases the load on the master server and the time it takes to gather and load data in OpsCenter.
 
For more information on enabling data collection for breakup jobs / subjobs, please see the OC 7.5 Admin Guide page 336-341 - http://www.symantec.com/docs/DOC5042
 

Note: If this post provides you with a solution don't forget to mark the discussion as solved...

SOLUTION