Hi all,
I've an infrastructure on 10.0.2 version composed by:
- 1 control center
- 2 scanner
I've to upgrade it at 10.5 version (with the intermediate upgrade to 10.0.3).
I think I've to perform 3 steps:
1) upgrade of the control center
2) upgrade of one scanner
3) upgrade of the other scanner
Will I lose service continuity during the process? I think I will not because in phase 1 the mail flow should be normally processed and in phase 2 and 3 the message queues will be managed by the other scanners (I will stop the queues on the scanner before the upgrade).
Am I right?
Thanks!