Previous days job reports in CPS?
Created: 18 Apr 2011
Is there a way to retrieve job reports (with the full pair logs, etc.) from CPS backup jobs other than the last one that ran? My CPS jobs run once every day in a scheduled window, and I need to see how the backup went on Friday the following Monday, but I only get to see Sunday's log which is not helpful.
Also does anyone know if there is a way to have the system e-mail these job reports?