Vidéos d'aide de Screencast

CASO 2012 - How to migrate job control from a managed server to CAS

Created: 19 Décembre 2012 | 1 commentaire

After converting one of our standalone BE 2012 servers to be a managed server in CASO I've noticed that all the backup jobs are still controlled by the managed server. I want the CAS to control the backup jobs, but I have not been able to figure out how to move control to the CAS. Can someone tell me how to do that. 

Thanks

Commentaires 1 CommentAccéder au dernier commentaire

l'image des Andrew_Serna

This can be done using a powershell script here is a tech doc with some more information. http://www.symantec.com/docs/TECH184683