Video Screencast Help
Protect Your POS Environment Against Retail Data Breaches. Learn More.

Post Command to run after Cancelled or Missed Backup (not only Failed)

Created: 23 Mar 2010
Waelbers's picture
4 Agree
0 Disagree
+4 4 Votes
Login to vote

I am running 2 backup jobs every night. The first shuts the database down with a precommand. The second brings the database up again with a post command.

If there is no tape in the drive, the database doesn't come up, as the second backup Job is Cancelled (after 3 hours), and not Failed. In that case the database remains down.

Please make more elaborate options for the post command and when to run. We could have tick boxes after which sort of errors the post command should run.

Thank you

Lode