Update Job status
Created: 25 Feb 2013
Backup Exec 2010 R3
When a test run of a job fails, the job is put on hold - fair enough. On a successive test run, if it is successful, it should check the job status and if the job was put on hold due to a prior failed test run, the job status should change back to the original (probably "scheduled") status. Just a thought.
Idea Filed Under: