截屏视频帮助

Synthetic duplication jobs

创建时间: 22 12 月 2013 • Updated: 23 12 月 2013 | 2 条评论
Christian Dergovics 的图片
1 同意
1 不同意
0 2 Votes
Login to vote

Demand note:
Because of backup volume (time window) and retention time on b2d-space only one FULL Backup per week with INC inbetween.

Requirement:
Customer request daily tape sets with “full” backups for offsite storage.

Possible solution:
Synthetic duplication jobs – Backup Exec should make an synthetic FULL backup and copy this to tape (like an restore from an INC backup). Time windows is not an issue because processing is only on BE media server.

Regards,
Christian

Update:
Should be possible with V-Ray Edition - (Hyper-V and VMware VMs).

评论 条评论跳转至最新评论

pkh 的图片

You can do this by doing a synthetic backup after each incremental job and then duplicating the synthetic backup to tape.

0
Login to vote
Christian Dergovics 的图片

Thank you for your answer.
I've updated my post because I have forgotten to mention that this should work in VM environments.
Also it is a license issue because the normal synthetic backups are not included in the V-Ray Edition.
And further this option may not work with VM images – as you mentioned here:
https://www-secure.symantec.com/connect/forums/synthetic-backup-3
 

0
Login to vote