截屏视频帮助

Incremental backup job doesn't run and is set to 'Superseded' status if full backup job with no recurring schedule is suspended after it is performed

创建时间: 13 11 月 2012 • Updated: 13 11 月 2012 | 1 条评论
smashimo 的图片
2
投票
Login to vote
Me Too!I have the same issue
Product(s): Backup Exec
严重性: 重大功能
状态: 正在调查/收集信息
Tech Note: More Information

 If a full backup job with no recurring schedule is suspended after it is performed, the subsequent incremental/differential backup job does not run and the job status is set to 'Superseded' when the scheduled time comes.

The job can be suspended via BEMCLI with the following commands:

BEMCLI> Get-BEJob "Job-Name-Full" | Start-BEJob -Confirm:$False | Wait-BEJob ; Get-BEJob "Job-Name-Full" | Suspend-BEJob

Please be noted that this issue reproduces only when a full backup job does not have recurring schedule.

This issue is currently under investigation by Symantec Corporation. For more information please check the following article.
http://www.symantec.com/docs/TECH199662
 

评论 1 Comment跳转至最新评论

ankmah 的图片

Is this occurring continuous for next schedule also?...

If No!!! My suggestions to check Master server Global Properties (number of occurred jobs in 12 hours)

0
Login to vote